BEIJING NATIONAL STADIUM


Beijing National Stadium, originalmente cargada por THE Tech Scoop.

The Year of the Rat, is a stadium finished for the Olympic Green in Beijing, China that was completed on March 2008.The stadium will host the main track and field competitions for the 2008 Summer Olympics, as well as the opening and closing ceremonies. It is located east of the Beijing National Aquatics Centre.

In 2002, Government officials engaged architects worldwide in a design competition. Pritzker Prize-winning architects Herzog & de Meuron collaborated with ArupSport and China Architecture Design & Research Group to win the competition. Contemporary Chinese artist, Ai Weiwei, is the Artistic Consultant for design. The ground was broken on Christmas Eve December 2003, and construction started in March 2004, but was halted by the high construction cost in August 2004 and continued again. In January 2008, concerns about construction working conditions arose when it was revealed that 2 workers had died during the stadium's construction.

The stadium can seat as many as 91,000 spectators during the Olympics. The capacity will then be reduced to 80,000 after the Games. It has replaced the original intended venue of the Guangdong Olympic Stadium. The stadium is 330 metres, (1,082 feet) long by 220 metres, (721 feet) wide, and is 69.2 metres,(227 feet) tall. The stadium uses 258,000 square metres (2,777,112 square feet) of space and has a usable area of 204,000 square metres (2,195,856 square feet). It was built with 36 km of unwrapped steel, with a combined weight of 45,000 tonnes. The stadium will cost up to 3.5 billion yuan (≈423 million USD).


Share/Save/Bookmark

No hay comentarios: